top of page
Two workers in safety gear collect water samples on a rocky shoreline

Get Your ESA Report Fast

Request a CSA-compliant environmental site assessment in Edmonton, Calgary, or anywhere across Alberta, lender-approved and ready on time.

CSA-compliant

Lender-approved, 

2,500+ Assessments

Fast, Reliable Turnarounds

We Meet Your Deadlines, Every Time

Trusted by 2500+ Happy Customers

Top-Rated Service with a Five-Star Google Ranking

Proudly Alberta-Owned and Operated

Alberta flag

 15+ Years of Experience 

Remediation Services in Alberta

Remediation (formerly known as Phase III ESA) is the cleanup of contaminated material identified by the Phase II ESA through several ways such as:

 

  • Excavation and removal of contaminated material, followed by the sampling of the walls and base to confirm that the contaminated soil has been removed. Next, clean fill material is brought to the site to backfill the dig and recontoured to match the existing grade.

  • Injection of chemical compounds or microbial slurries to react with the contaminants of potential concern (COPC) and break them down into non-harmful components.

  • Extracting harmful vapours from monitoring wells at the Site, assisting in the degradation of the COPC.

  • Long-term monitoring of groundwater at the Site, to track and compare concentrations of COPC over an extended period of time.

tank removal
Gloved hands place soil into a plastic bag using a small shovel in a dry
Two workers in hard hats and safety gear examine samples by a shoreline

​Restore Your Property with Professional Remediation

Resolve contamination efficiently with Vista Environmental Science. Our remediation solutions help bring your site back to compliance safely and effectively.

UST removal

Soil Sampling/Test Pitting

Do you have an area that you think may be contaminated and need it cleaned up quickly and cost-effectively?

 

Vista will perform a delineation program by advancing boreholes using a drill rig or hand auger to accurately map the vertical and horizontal extent of the plume and then remove the contaminated material from the Site for disposal.

 

Following removal, Vista will source clean fill material to fill the pit back and recontour it to match the surrounding grade.

Groundwater Monitoring/Sampling

Have Vista sample your storm pond, drainage ditch, or existing groundwater monitoring wells to set a baseline for the concentration of COPC.

excavation
remediation (VES22-102B)
bio rem with Vista Sign
tank removal_2
remediation gallery.jpg
UHNN1183.JPG
remediation CTA.jpg

Start Your Cleanup Plan Today

Let Vista help you restore your site quickly and cost-effectively with proven remediation solutions.

bottom of page